Tunheim bridge has been rehabilitated
Tunheim bridge on Tynset has now been fully rehabilitated after the municipality was found to have suffered major damage and defects that affected load-bearing capacity, traffic safety and service life.
Aker Solutions Verdal extends the contract with Beerenberg
Aker Solutions has triggered an option for Beerenberg's contract in Verdal for a two-year option period.
When seconds count
In less than seven days, 4 torches will be replaced on Kårstø and the mission will be one of the most spectacular in Beerenberg's history.
Beerenberg takes over maintenance at Gina Krog
From January 2024, Beerenberg will carry out permanent maintenance for Equinor at Gina Krog in the North Sea. The work on the installation, which entered Equinor's FLX portfolio in May 2023, will help ensure an extended service life until 2036.
Passive Fire insulation of the Tingstad tunnel in Sweden
Beerenberg´s solution allowed for swift installation and reopening of the busy E6 route.
Robot technology: a game changer for maintenance
For more than 47 years, Beerenberg has delivered innovative service solutions to a wide range of industrial enterprises. The group is one of the leading suppliers of maintenance and modification services on the Norwegian continental shelf, and a global supplier of insulation products.
Asbjørn Sletten Nesse awarded "The engaged"
For the second time in history, Beerenberg conducted an internal recognition of skilled individuals and talents within the company, based on three different categories. In the Beerenberg Awards, a total of 142 nominations poured in, leading to fierce competition to reach the top.
Among the highly qualified candidates, Asbjørn Sletten Nesse emerged as a shining winner in the category "The Engaged".