Referanser - Decom
- Info
- Quailification of diamond wire cutting technology for ESSO/Heerema for removal of Odin - axial load more than 1000 tons.
- Cutting of tubing hanger on subsea oil well at 350 m depth at Snorre A for StatoilHydro
- Development and execution of vane shaper technology for cutting/shaping of stay vane on turbines for General Electric in Venezuela
- Removal of pipelines and structure by RAT based cutting and machining on the Snorre A modification project for StatoilHydro and LMT.
- Cutting of glycol tanks (3,5 m OD, 140 mm wall thickness) with ROS S5 for Aker Solutions on the Frigg Cessation Project
- Removal of asbestos and mercury for Aker Solutions on the Frigg Cessation Project
- Mobile cutting and machining, mechanical assistance and habitat (multi-discipline) on the Kollsnes Refinery for Aibel
- Mobile cutting and machining on Snorre A for LMT
- Various cutting on the Mongstad Refinery for StatoilHydro
- Mobile cutting and diamond wire cutting of pipes and tanks on Transocean Searcher
- Cutting of U-profiles with diamond wire on Statfjord B for Seawell
- Cutting of sealine/pipeline bundles with ROS - S5 for Aker Solutions on the Frigg Cessation Project
- Mobile cutting and mechanical assistance supported with RAT on Snorre A for Odfjell Drilling
- Cutting of tank base plate with diamond wire on Ekofisk Bravo for Aibel
- Cutting of various steel/concrete structures with diamond wire on Melkøya for NCC/Aibel
- Mapping and removal of asbestos for Aker Solutions on the Frigg Cessation Project
- Cutting of heat exchangers (0,95m OD, 32 mm wall thickness, 770 titanium tubes inside) with diamond wire on Eldfisk A for Aibel
- Cutting of steel structures and caisson with diamond wire on Draupner for Aibel
- Cutting and removal of grating, walk ways and ladders under double bottom and on columns assisted with RAT on Polar Pioneer for Transocean